Searchable article text
RMT helpline 0800 376 3706 :: february 2023 :: RMTnews
16
Avanti West Coast is the train
operating company owned by
FirstGroup (70 per cent) and
Trenitalia (30 per cent) that
operates the West Coast
Partnership (WCP) franchise.
At the end of 2019 it took
over operations from Virgin
Trains which had run the
franchise since 1997 and the
franchise was scheduled to run
until March 2030. However,
the Department of Transport
introduced an Emergency
Recovery Measures Agreement
(ERMA) in September 2020 to
deal with the pandemic set to
expire in October 2022.
The DfT extended the
ERMA arrangements until the
end of March 2023 under
broadly the same terms and
conditions.
Problems began almost
immediately after Avanti took
over the franchise as they lost
staff and failed or refused to
replace them, presumably to
manage down staff costs.
Instead, they attempted to
force existing staff to work
longer shifts and cover more
work.
Then last year Avanti West
Coast began reducing its
timetable and blaming its staff
in the media with
unsubstantiated claims of
unofficial strike action. Trains
were running at one service
per hour most routes, as
opposed to the three which
would typically run on the
London Euston to Manchester
Piccadilly route. Media stories
also emerged of numerous
train cancellations,
overcrowded services, delays
and expensive fares.
The Mayor of Greater
Manchester Andy Burnham
expressed his frustration by
calling on the government to
strip Avanti West Coast of its
franchise and the CEO of
Avanti West Coast resigned
amid the controversy.
In October last year when
the government extended
Avanti's contract until the end
of next month it stated that
"drastic improvements" were
necessary. However, according
to figures released by the
Office of Rail and Road in
November, Avanti West Coast
had the worst record of train
cancellations in the year prior
to this date.
Before Christmas Rail
Minister Huw Merriman told
the House of Commons that
Avanti’s incoming timetable
would mark a new departure
because its services would be
no longer reliant on staff –
drivers and Train Managers –
volunteering to work overtime
or on their Rest Days.
“This timetable change
represents an opportunity to
put in place a long-term
timetable base and to return
to the extended booking
horizons that passengers
rightly expect,” he said.
At the time of this debate,
RMT surveyed Avanti staff who
told the union that they had
no confidence that Avanti
would be able to deliver its
new timetable as the company
was simply too short-staffed.
Avanti’s internal
TAKE BACK
WEST COAST
CHAOS: Passengers at Euston station following train cancellations last
year as London mayor Sadiq Khan and Greater Manchester mayor
Andy Burnham slammed Avanti West Coast for drastically reducing its
timetables as "completely unacceptable".
RMT calls for Avanti West Coast to be taken into
public ownership at end of contract in April
ANGER: Ian Bryne Labour MP
for Liverpool West Derby is
just one of many MPs across
the political spectrum
calling for Avanti to be
stripped of its West
Coast franchise.