Searchable article text
RMT helpline 0800 376 3706 :: may 2019 :: RMTnews
8
R
MT has stepped up pressure
for a public inquiry
following fresh concerns over
helicopter safety standards in
the North Sea.
Air Accident Investigation
Board report which found that
fatigue amongst ground
engineers contributed to a near
miss at Aberdeen airport
involving an Airbus 175
helicopter operated by CHC.
RMT also called on
helicopter operator Babcock and
aircraft manufacturer Airbus to
be completely transparent on
the situation with the Airbus
H175 after shocking images
were circulated around the
North Sea.
RMT members have raised
concerns about the pictures
which it is claimed are images
of the crack in the “Horizontal
Stabiliser” of an H175 operated
by Babcock. The picture appears
to show a substantial fracture in
the fuselage and our members
have understandably called for
an explanation from Babcock to
explain the images.
RMT members are also
calling for an explanation from
Airbus to clarify how and why
a ‘safety’ measure should be
flying the aircraft at a reduced
speed? Members argue the
aircraft was presumably
designed to fly at a certain
speed, meaning Airbus are in
effect saying that it is no longer
safe to do so?
RMT general secretary Mick
Cash said that following on
from the images of a damaged
tail rotor on a 175, the findings
of fatigue and a lack of care for
engineers working on the
offshore helicopter fleet is
deeply disturbing for offshore
workers and their families.
“The government’s abject
failure to take this problem
seriously over the last decade is
another slap in the face for
offshore workers who keep our
economy ticking over but are
simply expected to get on with
travelling in helicopters that are
subject to dangerous levels of
commercial pressure.
“This ‘out of sight out of
mind’ approach to the safety of
offshore workers must be faced
down and an independent
public inquiry launched into the
safety of offshore helicopters,
including the commercial
pressures that this latest safety
investigation has again flagged
up.
“RMT will be stepping up the
pressure on government and
safety agencies for that
inquiry,” he said.
R
MT members working for
outsourcing giant ISS took
48 hours of strike action in
opposition to the imposition of
shift patterns that will mean
working an additional 60 shifts
per year.
The cleaners are sub-
contracted to the Hitachi rail
contract supplying rolling stock
to GWR on the Western train
services.
Both Hitachi and ISS are
intent on cutting costs and
improving profits on their
contracts and are determined to
ram through shift patterns that
will wreck the work/life
balance of these night shift
cleaners.
The cleaners are determined
to defend their established
work patterns and returned a
100 per cent yes vote for strike
action.
RMT is calling for both
Hitachi and ISS to come to
their senses and stop ratcheting
up the exploitation of these
low-paid workers through
negotiations with RMT.
RMT general secretary Mick
Cash said that it was appalling
that ISS staff on such a
prestigious rail contract were
being treated in this disgraceful
fashion which will pile
additional hours on them and
destroy their work life balance.
“Hitachi, ISS and GWR
should all be hanging their
heads in shame and should pull
back immediately.
"RMT has made it clear that
we will be stepping up the fight
against the scourge of
outsourcing on our railways
that is highlighted by the
scandalous treatment of these
ISS staff in West London.
"The union remains
available for talks but no one
should underestimate the
resilience and determination of
our ISS members,” he said.
RMT DEMANDS
PUBLIC INQUIRY INTO
HELICOPTER SAFETY
OUTSOURCED GREAT WESTERN
RAILWAY CLEANERS TAKE ACTION