Searchable article text
RMT helpline 0800 376 3706 :: march 2013 :: RMTnews
29
ACROSS
1
First World War term for
Germans (6)
4
First World War flying ace
(3,5)
9
Responsible by law (6)
10 Range separating Lancashire
and Yorkshire (8)
11
Painter/performer (6)
12 Capital of Serbia (8)
13 To make an error (3)
14 Mushroom (3,3)
17 Hindu heaven (7)
21 Texan border town (2,4)
25 Ironic (3)
26 Delivered bomb over
Hiroshima (5,3)
27 Free (6)
28 Optimistic (8)
29 Allocate (6)
30 Herb (8)
31 Clam from Southend (6)
DOWN
1
Balkan country (8)
2
Nazi insignia (8)
3
One who steers a ship (8)
5
Capital of Devon (6).
6
Harmless (6).
7
Air strip (6).
8
Egyptian revolutionary
leader (6).
12 Courage (7)
15 Seed (3)
16 Single (3).
18 Outside (2,6)
19 Three goals (3,5)
20 Absurd (8)
22 Erupting spring (6)
23 Imperial weight (6)
24 Empty space (6)
25 German composer (6)
£50 PRIZE
CROSSWORD
No. 83. Set by Elk
The winner of prize
crossword no. 82 is
Mr A Jakeman, Weston-
Super-Mare.
Send entries to Prize
Crossword, RMT, Unity
House, 39 Chalton Street,
London NWI IJD by
March 25 with your name
and address.
Winner and solution in next
issue.
No. 82 solution...
Dear Daily Mirror editor,
May I congratulate you publishing
damning reports by Mark Ellis exposing
the current state of track maintenance
and the risks it poses to the general
public.
Having been a track chargeman in
change of maintenance gangs on the
Western region between Didcot and
Swindon for 36 years, I saw many
changes of practice. The biggest error of
all was rail privatisation which led to
mas redundancies of an experienced
workforce. This led to a decline in track
examination and maintenance.
The pictures published by the Daily
Mirror appears to me to be a rail failure
known as ‘flash but weld’ on long
welded track. These type of welds used
to be done at the rail rolling mills before
being transported on site. The break that
you reported should have caused a ‘track
failure’ to protect approaching traffic.
In my days of track maintenance these
type of faults were found by ultrasonic
devices either on a special train or by
hand held ‘ultrasonic rail flaw detectors’.
This was carried out at set intervals over
the entire district of each civil engineer
and covered all main lines.
If any fault was found it was
immediately reported to the section
supervisor or track chargeman who
would carry out a visual examination
and an ‘emergency occupation’ of the
track would be arranged to remove the
effect. This was because any expansion
or contraction could cause a rapid
deterioration in the stability of the track.
To try and repair a severe rail crack
without that procedure was never
attempted to my knowledge.
This brings me to the Hatfield disaster
which, in my opinion, was caused by a
broken weld and I believe the enquiry
into the crash was a whitewash.
Thanks again for bringing your report
Track and Ruin to the notice of the
public.
Retired RMT member B. Tilling
DAILY MIRROR PRAISE
Letters...