Searchable article text
RMT helpline 0800 376 3706 :: march 2013 :: RMTnews
4
An enquiry has been launched
after RMT released shocking
pictures revealing six inches of
rail head crumbled away leaving
a lethal gap in the track on the
InterCity East Coast Mainline at
Hambleton South Junction near
Selby.
The picture follows RMT’s
publication by of a similar
damning picture taken at Colton
Junction on the ECML just a
few miles away in December
last year where normal running
speeds are 125mph.
It appears from the picture
that an original crack had been
identified on inspection and
painted blue to mark it down
for repair or replacement,
exactly as happened at Colton
Junction.
But due to delays, which
RMT blames on maintenance
and staffing cuts, the initial
crack crumbled away to a large
gap in the rail head, leaving the
risk of a serious and potentially
lethal incident. A train could
have derailed, jumped the tracks
and collided with an on-coming
service.
RMT understands that there
is massive pressure to keep the
ECML running from the
government and the Department
of Transport as they look to re-
privatise the service. There are
also persistent demands on
Network Rail from the budget-
holder, the Office of Rail
Regulation, to cut back on rail
renewals work despite the
potentially-lethal consequences
as exposed in graphic detail by
RMT.
Pressure from a high-profile
media campaign by the union
has forced Rail Accident
Investigation Branch (RAIB) to
launch a full investigation into
the condition of the track on the
ECML.
The RAIB is also
investigating a number of rail
breaks that have occurred on
other lines including:
• a vertical rail break that was
discovered on a section of
continuously welded rail,
after a member of the public
reported unusual levels of
noise as trains passed over a
stretch of line near Corby
Glen, Lincolnshire (September
14 2012);
• an approximate 100mm gap
due to a broken rail at an
insulated block joint Main
line at Copmanthorpe, near
York, that was reported by
the driver of a train on the
adjacent line (November 28
2012).
Both of the above incidents
involved sections of line
traversed by trains travelling at
speeds in excess of 100 mph
The latest shocking pictures
will fuel the urgency of that
investigation which the union
says must focus on the impact
of cuts to staffing and renewals
and the consequences of sub-
contracting core functions.
RMT general secretary Bob
Crow said that the latest
shocking pictures highlight the
reality on Britain's railways
today.
“Staffing, inspections and
track renewals have been cut in
the dash to save money and
there is massive pressure from
the top of government to keep
services running at all costs
regardless of the potential
human cost.
“If we don’t reverse the cuts
on Britain’s railways another
major tragedy is inevitable,” he
said.
The union has argued that
the McNulty report means that
the industry is now facing
exactly the same set of
poisonous conditions that lead
to the Hatfield disaster.
“RMT is demanding action
before it is too late and the
RAIB investigation must look at
the poisonous impact of cuts to
staffing and renewals work and
the sub-contracting of jobs that
should be undertaken in-house,”
he said.
RMT exposes gap in track
on East Coast mainline and
warns of "another Hatfield"
if staffing and maintenance
cuts aren't reversed
RMT
SPARKS
BROKEN
RAIL
ENQUIRY