Searchable article text
Tissue
of Lies
Support the fight for
Jobs and Safety on our Tube
RMT helpline 0800 376 3706 :: march 2011 :: RMTnews
5
R
MT warned of more tube
chaos for passengers after
Transport for London revealed
plans to cut the frequency of
safety-critical inspections from
twice a week to once a week.
In a safety licensing
concession requested by London
Underground the twice weekly
inspection of track and
infrastructure in sidings and
depots will be cutback to just
once a week.
These inspections are in the
areas of highest traffic
anywhere on the network with
the fleet constantly being
shunted in and out.
The latest target for cuts is
the White City Depot but it is
just part of a rolling programme
of maintenance and job cuts
that London Underground are
seeking to roll out across the
network by stealth.
RMT has warned that key
faults like broken rails and loose
bolts and fittings will not be
picked up with the end result
that trains will be stranded,
adding to delays and disruption
for passengers.
LU admit that this latest
cutback is cash-led and part of
their programme of reducing
“head count” - management
speak for axing jobs.
As part of its concession
request TfL uses contradictory
language such as the need to
“extend” patrolling frequency to
once per week, from the current
twice per week in the interests
of “safety”.
TfL claimed that it was
“preposterous” to suggest the
change would have any impact
because it was “where trains run
at very low speed”.
RMT has pointed out that the
speed on these sections is
irrelevant – the frequency is
what matters and the weight of
the train is no different.
RMT general secretary Bob
Crow said that LU had been
caught out again halving vital
inspections and making a total
nonsense of London mayor
Boris Johnson’s claim that there
will be no cuts at the front line.
“This move, ludicrously
dressed up as having safety
benefits, will trap the fleet in
the sidings and depots leaving
passengers waiting for trains
that never come because an
accountant decided that halving
safety inspections to cut costs
was a good idea,” he said.
OLYMPICS DEBACLE
TfL has claimed to the media
that a working party has been
set up with unions to
investigate running Tube
services for 24 hours a day
during the 2012 London
Olympics despite not even
informing the trade unions
involved.
RMT general secretary Bob
Crow said that despite a
campaign of spin suggesting
that all was sorted, the hard fact
is that there is no agreement
for operating hours, volume of
service, staffing levels or
payments the Olympics.
"Continued job cuts and
attacks on maintenance
schedules mean that the tube is
short of capacity and prone to
regular breakdowns, let alone
when we've got another million
people to shift around the City.
"None of this is helped by
Boris Johnson's continued
refusal to talk directly with
transport unions on the crucial
issue of the cuts programme
being driven by his officials,” he
said.
RMT WARNS OF CHAOS AS
SAFETY-CRITICAL TUBE
INSPECTIONS SLASHED