Searchable article text
RMTnews :: january 2007 :: www.rmt.org.uk
14
A
s part of the London
Underground network, the
East London Line currently has
unified signalling, train and
station operations under public
control, with maintenance and
renewals sub-contacted to
Metronet.
However, the extended line,
due to be finished in 2010, will
consist of an unnecessarily
complex hybrid of the and
national rail network and
private companies.
In fact a total of eight
companies will be involved in
running the new service. Of
these two companies will be
responsible for signalling
operations, two for
infrastructure maintenance, two
for infrastructure renewals, one
for train and station operations
and one for train maintenance
Specifically, track, stations
and signals maintenance and
Renewals between Dalston
Junction and New Cross/New
Cross Gate will be the
responsibility of London
Underground but sub-contracted
to a private contractor.
Track, station and signals
maintenance between New Cross
Gate to West Croydon and
Crystal Palace and from Dalston
to Highbury and Islington and
the rest of the North London
Line will be responsibility of
Network Rail. Renewals for the
same section of line will be also
sub-contracted out.
Signalling operations
between Dalston Junction and
New Cross Gate will be the
responsibility of London
Underground. But between New
Cross Gate to West Croydon and
Crystal Palace and from Dalston
to Highbury and Islington
signalling operations will be the
responsibility of Network Rail.
Passenger train services and
operations of stations will be
the responsibility of the
successful bidder. Meanwhile,
responsibility for maintaining
trains will be the responsibility
of Bombadier.
Got all that? If you did you a
part of a very small group of
people who did not have to sit
down for a while to understand
who was exactly supposed to be
doing what.
CAMPAIGN
If this scenario sounds familiar
it is because this is the sort of
fragmentation that occurred
following privatisation which
has proved so disastrous for
Britain’s railway network.
The Public Private
Partnership on London
Underground has created a
fragmented network with
frequent service disruptions.
Privatising the East London
Line will make matters worse.
Eight different companies will
be involved in complex
contractual relationships to
operate, maintain and renew
signalling, track, trains and
stations.
That is why the TUC has
joined RMT and TSSA to
campaign against moves by
Transport for London to
privatise the East London Line
by 2010.
This privatisation will also be
the thin end of the wedge, with
other lines and services being
threatened with sell-off in
future.
If this privatisation takes
place it will be the first Tube
passenger service to be
privatised, making it easier to
argue for the privatisation of
other services.
The union is urging members
to use a new postcard (above) to
ask your MP to sign Early Day
Motion 286 (right) which
supports the retention of the
East London Line in the public
sector.
Act now to stop the East
London Line sell-off.
EDM 286 FUTURE OF
LONDON UNDERGROUND
PASSENGER SERVICES
Jeremy Corbyn
That this House welcomes the
important role that the London
Underground East London Line
extension will play in creating a
world class transport
infrastructure in preparation for
the 2012 London Olympic and
Paralympic Games; further notes
that the East London Line is
currently operated in the public
sector by London Underground; is
concerned that there are
proposals to transfer
responsibility for operating the
line to the private sector which
would represent the first
privatisation of a tube passenger
service; believes that the benefits
of an extended East London Line
will be best achieved by the
service remaining wholly in the
public sector; notes the
IPOS/MORI poll showing that
three quarters of people in
London and the South East want
the East London Line operations
kept in the public sector;
welcomes the decision of the
2006 TUC Congress opposing the
privatisation of the East London
Line; and supports the rail
unions and TUC campaign to
keep the East London Line wholly
in the public sector.
RMT News looks into attempts to
dump the East London Line into
the private sector and the
resulting fragmentation which
caused such chaos on the railways
following privatisation
FRAGMENTING
THE EAST
LONDON LINE